D-Raintank® Installations

                                                                                            
  70 m³ / 2472 f³   Project        View installation                     

  10 m³ /   353 f³   Project        View installation

155 m³ / 5474 f³  Project         View installation                                      
  80 m³ / 2825 f³   Project        View installation

  15 m³ /   530 f³   Project        View installation

  40 m³ / 1412 f³  Project         View installation

  75 m³ / 2648 f³   Project        View installation  

  75 m³ / 2648 f³   Project        View installation                 

  20 m³ /   706 f³   Project        View installation

  35 m³ / 1236 f³   Project        View installation    

  90 m³ / 3178 f³   Project        View installation

  94 m³ / 3320 f³   Project        View installation

  15 m³ /   530 f³   Project        View installation

Installation instructions for D-Raintank®

Installation instructions for traffic loads up to SLW 60
(View Installation instructions for loads up to 2.5 t)

 

Provide the excavated trench with engineered specified fill, dependent on predetermined soil conditions.




 

Now install D-Raintank®. If necessary, these can be connected with proprietary clips.



 

Carefully wrap D-Raintank® with geotextile, taking care to overlap the material by at least 300mm.



 

First place the ballast material onto the tanks to eliminate lateral movement during back filling



 

Then fill the side areas in layers.



 

Compacting at the side of D-Raintank® is essential. Again, compaction is to be done in layers.



 

For compacting above D-Raintank®, a plate temper is recommended.

Compacting with "trains of rollers" is not permissible!